High and low temperature test chamber loading should pay attention to 5 points, do not know to eat soy

After the newly purchased high and low temperature test box is transported to the designated location, we need to remove it from the car. There are many doorways and pay attention to this operation procedure. If you don’t know, you will have to lose weight. Next we Come to a simple discussion of this daily loader.

1. When the tower crane pulls up the high and low temperature test chamber, our operators need to perform this operation step slowly and at a constant speed to prevent accidents.

2. During the carrying process, all power supply procedures should be turned off to prevent an explosion.

3. If you are using a forklift to load the program, don't forget to put the special pallet on the bottom of the high and low temperature test chamber before the forklift is scooping up the test box, because it can prevent the inside of the forklift. The convex profile at the bottom scratches the bottom of the test chamber.

4. When unloading, the running speed of the tool used must be slow, and it should be uniform, which is beneficial to ensure the service life of the equipment is prolonged.

5. The environment in which the equipment is placed must be clean and stable. Remember to avoid water and corrosive impurities so as not to damage the outer packaging of the cabinet.

The shipment and unloading of the high and low temperature test chambers is related to whether the equipment can operate normally and without worry, so we must be careful when doing these two procedures.

Oxford Fabric

Cvc Oxford,Oxford Shirt Fabric,Oxford Fabric For Shirt,Oxford Shirt Fabric

Shaoxing Yingcheng Textile Co.,Ltd , https://www.sxyingcheng.com